Re-Sync node

ReSync Node option can be used to resolve the mismatch of node data between TJ5500 and TJ5100.

Perform the following steps to re-sync the selected node:

  1. On Manage Nodes page select the desired node.
  2. Right-click and select ReSync Node. A confirmation message is displayed.
  3. Click OK. A message ReSyncNode triggered successfully for <node> is displayed.

    Click Manage Node(s) link to view the status of the node or click Close to close the ResyncNode window.